Malden Local Notifications PLUS
Open Issues: 133
Closed Issues: 369
Acknowledged Issues: 38
-
OtherOpen100 Sylvan St Malden MA 02148, United States - Malden Ward 5Construction is taking place on Sylvan Street - it is incredibly noisy and they began at 6.30am today This is completely unacceptable on a residential street We have young children, the noise is completely intolerable They have heavy machinery ripping up the street right outside our house
-
RepathingOpen71 Granville Avenue Malden, MA, 02148, USA - Malden Ward 5What is happening with the repathing project on Granville Ave. Started on the first of May it seems like it is on shutdown.
-
Kenmore Rd Malden, MA, 02148, USA - Malden Ward 4I am a resident on Kenmore Road and would like to know why the City Engineer is unreachable and allowed to work from home today when Kenmore Road and Autumn Street have no water until 3pm or later? How is this reasonable?
-
PotholeAcknowledgedBower St Malden, MA, 02148, USA - Malden Ward 3Happy 4th! There are 2 sections of Bower St in between the perpendicular streets Fall/Wiley that are in need of repair. The residents would greatly appreciate if these 2 sections could be addressed. Thank you for all your hard work!
-
OtherOpen114 Converse Ave Malden MA 02148, United States - Malden Ward 1They paved on another street and left all these cracks in here. I almost twisted my ankle walking here with my dog. This needs to be all paved here they only did half way and there’s rocks everywhere they need to clean this up on Converse Avenue down a dead end street with people walk on the trail with kids and animals. It has rocks all over the street.
-
Malden MA - Malden Ward 3Please paint a "Stop Line" and the word "Stop" on the pavement at the intersection of Cushing Road and Chandler Road per Traffic Commission meeting 10/16/18.
-
183 Bainbridge St Malden, MA 02148, USA - Malden Ward 5173 Bainbridge. missed road work during repavement
-
93 Maplewood Street Malden, MA, 02148, USA - Malden Ward 6The transition from the newly made concrete sidewalk at the entrance to the bike path is extremely steep in front of Malden Spring and violates ADA and State Accessibility laws. This is new work and by law must comply. Just shows people running the city care more about bikes then the handicap or parents with strollers.
-
640 Main Street Malden, MA, 02148, USA - Malden Ward 4resident had asked when they put in the near wheelchair ramps here to have the barrier so no cars hit the building put back after they were done and it never was (RL)
-
PotholeOpen192-248 Hawthorne St Malden, MA, 02148, USA - Malden Ward 3The street and sidewalks were opened up in April to replace lead water piping. They were temporarily patched but the company never returned to mill and overlay the entire road as the contractor said they would. Once we get into winter, the street is going to turn into a pothole nightmare when the patches get damaged by plows and freeze thaw. Some of the granite curbs were also left askew and misaligned leaving potential for car damage issues when parking. Finally, the asphalt patches on the concrete sidewalks were done in a very temporary method, so I would like to know when these will be permanently repaired with replacement segments of concrete for the segments that were saw-cut through. I know the state approved $200M for reconstruction and maintenance of municipal roads so this would be a great place to apply a little bit of that.
-
Tree - All OtherAcknowledgedLincoln St Malden, Massachusetts, 02148 - Malden Ward 3
Limb of tree rotted, heavy load on one joint area, on a windy day could eventually snap landing in neighboring yard.
Neighbor works on her garden outside, and is adjacent, and or right under her.
Tree would need to be either trimmed or evaluated.